EA-09-283 · CAL · Issued 2010-02-25 · Reactor Licensees
Action
EA Number
EA-09-283
Licensee
NOV (White)
Category
Reactor Licensees
Action type
CAL
Date issued
2010-02-25
Description
On February 25, 2010, a Notice of Violation was issued to FirstEnergy Nuclear Operating Company for a violation associated with a White Significance Determination Finding as a result of inspections at the Davis-Besse Nuclear Power Station. This finding involved a violation of 10 CFR 50.54(q) which requires, in part, that a holder of an operating license shall follow emergency plans which meet the standards in 10 CFR 50.47(b). 10 CFR 50.47(b) requires, in part, that the licensee have a standard emergency classification and action level scheme in use. The Davis-Besse Emergency Plan requires, in part, that the Shift Manager shall verify the indication of an off-normal event and classify the situation. Specifically, on June 25, 2009, the Shift Manager failed to verify the indications of an off-normal event or reported sighting, assess the information available from valid indications or reports of an explosion, and classify the situation as an Alert in accordance with the Emergency Action Level Conditions during an actual event.